Table 24 Nailing for framing1 Construction Detail Minimum Length of Nails, mm (in.) Minimum Number or Maximum Spacing of Nails Floor joist to plate – toe nail 82 (31⁄4) 2 Wood or metal strapping to underside of floor joists 57 (21⁄4) 2 Cross bridging to joists 57 (21⁄4) 2 at each end Double header or trimmer joists 76 (3) 300 mm (12 in.) (o.c.) Floor joist to stud (balloon construction) 76 (3) 2 Ledger strip to wood beam 82 (31⁄4) 2 per joist Joist to joist splice (See Table 29) 76 (3) 2 at each end Tail joist to adjacent header joist (end nailed) around openings 82 101 (31⁄4) (4) 5 3 Each header joist to adjacent trimmer joist (end nailed) around openings 82 101 (31⁄4) (4) 5 3 Stud to wall plate (each end) toe nail or end nail 63 82 (21⁄2) (31⁄4) 4 2 Doubled studs at openings, or studs at walls or wall intersections and corners 76 (3) 750 mm (30 in.) (o.c.) Doubled top wall plates 76 (3) 600 mm (24 in.) (o.c.) Bottom wall plate or sole plate to joists or blocking (exterior walls)1 82 (31⁄4) 400 mm (16 in.) (o.c) Interior walls to framing or subflooring 82 (31⁄4) 600 mm (24 in.) (o.c.) Horizontal members over openings in non-loadbearing walls – each end 82 (31⁄4) 2 Lintels to studs 82 (31⁄4) 2 at each end Ceiling joist to plate – toe nail each end 82 (31⁄4) 2 Roof rafter, roof truss or roof joist to plate – toe nail 82 (31⁄4) 3 Continued on p. 289